In case of laying gullies, siphons, intercepting traps, the cost includes
Correct!
Wrong!
Pick up the item of work not included in the plinth area estimate
Correct!
Wrong!
The expected out turn of 2.5 cm cement concrete floor per manson per day
Correct!
Wrong!
The inspection pit or chamber is a manhole provided in a base drainage system
Correct!
Wrong!
The area of the cross-section of a road fully in banking shown in the given figure, is
Correct!
Wrong!
Pick up the correct statement from the following:
Correct!
Wrong!
The height of the sink of wash basin above floor level is kept
Correct!
Wrong!
Pick up the excavation where measurements are made in square metres for payment.
Correct!
Wrong!
The minimum width of a septic tank is taken
Correct!
Wrong!
The brick work is measured in sq metre, in case of
Correct!
Wrong!
Pick up the incorrect statement regarding a master trap from the following :
Correct!
Wrong!
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is
Correct!
Wrong!
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and...
Correct!
Wrong!
The order of booking dimensions is
Correct!
Wrong!
The concrete work for the following part of the building of specified thickness is measured in square metres
Correct!
Wrong!
The item of the brick structure measured in sq.m, is
Correct!
Wrong!
While preparing a detailed estimate
Correct!
Wrong!
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.
Correct!
Wrong!
Pick up the correct statement in case of water supply.
Correct!
Wrong!
Brick walls are measured in sq. m if the thickness of the wall is10 cm
Correct!
Wrong!
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken
Correct!
Wrong!
Pick up the correct statement from the following:
Please select 2 correct answers
Correct!
Wrong!
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
Correct!
Wrong!
The plinth area of a building not includes
Correct!
Wrong!
The correct prismoidal formula for volume is
Correct!
Wrong!
Estimating and Costing
Perfect
Share your Results: